Following the preparation of the study area by leveling at the project levels, the work started by the measurement team in the applications up to the desired depth ends with the removal of the iron reinforcement prepared in the well and concrete by the help of the tremi pipe.
Depending on the nature of the ground, drill bit selection can be made and drilling equipment such as auger, bage and core barrel can be used. For very loose or wet surfaces, the application can be carried out by means of the casing pipe. Their diameters are Ø65, Ø80, Ø100, Ø120, Ø150. Project and ground characteristics are the most important data in deciding which of these diameters to work with. The bored pile can be operated as a friction pile or end pile in the underfloor reclamation or as a vertical element in shoring systems.